HONEY168WW --- 2023-07-01 08:37:52
1
請問有誰知道SAE J1128與SAE J1127對應(yīng)線材的火花測試電壓是多少?查看了這兩個(gè)標(biāo)準(zhǔn),都沒有相關(guān)內(nèi)容描述
游客 --- 2023-07-02 10:22:18
2
6.6 Insulation Faults
This is an in-process testintended for mass production of all cable covered in this document. The test electrode shall be of the link or bead-chain type and shall make intimate contact with the cable surface under test. The speed of the cable and the length of the electrode field shall ensure that each point of the cable is loaded with at least nine complete voltage cycles.
The test voltage is 2 kV (AC).
HONEY168WW --- 2023-07-03 11:20:38
3
好的 謝謝
xyh2018 --- 2023-07-04 17:14:28
4
游客:6.6 Insulation Faults
This is an in-process testintended for mass production of all cable covered in this document. The test electrode shall be of the link or bead-chain type and shall make intimate contact with the cable surface under test. The speed of the cable and the length of the electrode field shall ensure that each point of the cable is loaded with at least nine complete voltage cycles.
The test voltage is 2 kV (AC).
請問下這段是在哪個(gè)標(biāo)準(zhǔn)里面的? 謝謝!
IVAN728 --- 2023-07-15 10:55:23
5

SAE J1128-2020版本里面有描述“絕緣缺陷”的測試電壓是:AC 2KV