8
檢查所有成品電纜的導(dǎo)體與標(biāo)準(zhǔn)SANS 1411里規(guī)定的一致,這些測試不包括5.2到5.5部分。
sailorian:
5.1 Inspection
Inspect the conductors in the finished cable for compliance with all the relevant requirements of this part of SANS 1411 for which tests to assess compliance are not given in 5.2 to 5.5 inclusive.
5.2 Dimensions
