美女胸被狂揉扒开吃奶的网站o_亚洲日韩av中文无码专区_东京热激情无码专区_久久HEZYO久综合亚洲色_欧美成人高清视频_国产精品乡下勾搭老头_欧美一级v片在线播放_成人午夜国产视频_男女猛烈无遮挡免费动态图_亚洲一区国产精品视频

首頁 > 專業(yè)英語|國際貿(mào)易

[有獎翻譯] 5.10 有獎翻譯(過期)

P:2008-05-10 17:54:23

1

英譯漢

獎勵:以回帖時間最早并且答案準(zhǔn)確的為優(yōu)勝,獎勵人數(shù)1-5名,積分1-6分,金幣2-20。現(xiàn)為推廣期間,加分較多,請大家積極發(fā)貼。

2.1 Before commencing any checking or testing of a cable circuit and/or equipment the following
points should be adhered to:
2.2 Obtain any clearance to work or test permits that may be required from the appropriate
authority.
2.3 Ascertain that the cable and/or equipment to be tested is not 'alive' and is adequately 'earthed
down'.
2.4 In the eventuality of the cable and/or equipment not being 'earthed down' ensure that the
appropriate authority proves to your satisfaction that the cable/equipment is SAFE to work on
(i.e. circuit breakers and isolators open).
2.5 Set up the test equipment as close as practical to the cable and/or equipment to be tested.
(See Para 2.13).
2.6 Check that the cable and/or equipment to be tested is completely isolated from any other
equipment. (This does not include such things as post insulators and busbars which will not
be adversely affected by an applied high voltage.)

cable bent - 電纜垂度 (0) 投訴

P:2008-05-10 19:05:20

2

2.1 在開始對電纜線路和/或設(shè)備進行檢測或試驗前,應(yīng)注意滿足下列要求:

2.2 從主管部門獲取經(jīng)其認可的從業(yè)或試驗資格證明。

2.3 確定將被試驗的電纜和/或設(shè)備不是通路,并充分接地。

2.4 如電纜和/或設(shè)備有可能未充分接地的話,必須保證有關(guān)主管部門已確認在該電纜和/或設(shè)備上作業(yè)是安全的(如斷路開關(guān)和隔離裝置已斷開)。

2.5 設(shè)置試驗裝置,使其能最大程度且適用地滿足對電纜和/或設(shè)備的試驗。(見2.13段)

2.6對將被測的電纜和/或設(shè)備進行充分檢查,確保其已和其他設(shè)備完全斷開。(但不包括不會受高壓影響的器材,諸如柱形絕緣子和母線)

帖 子 獎 罰
appleseden 獎勵 20 金幣,.06 聲望,于 2008-5-19 12:04:46 原因:加分獎勵

aperture - 口,開口;孔徑,口徑 (0) 投訴

P:2008-05-11 16:59:31

3

正確

ground cable bond - 地面電纜接頭 (0) 投訴

3


你需要登錄才能發(fā)表,點擊登錄