1
pull test:
pre-conditioning : storage at -40℃ for 24 hours,and then aiiow to stabilize at room temperature for 1.5hours before stressing。
static load:27N(2.7Kg)applied at 15cm from the SR(strain relief)
positions:8 positions located 45° apart
duration: 1 minute per position
求那位大神幫忙翻譯下。
